Spartanburg County’s new multi-million dollar courthouse officially opened late January 2024.
W.N. Kirkland project efforts include:
• Installed all underground and aboveground water copper piping
• Installed underground and aboveground sewer and waste vents piping
• Plumbing fixtures include penal fixtures, emergency equipment
• Installed natural gas piping system consisting of Schedule 40 steel piping
• Extensive roof drain piping system
• Central Energy Plant building, installed natural gas and water piping
• Five-story parking garage included underground and aboveground cast iron storm drain piping system and copper water piping
• Large booster pump and water heating system installed