Located in Orangeburg, South Carolina
The 534,702 square foot distribution facility featured a unique and sophisticated pick module and conveyor system that is used to maintain an efficient nationwide distribution of pet food and supplies.
W.N. Kirkland project efforts include:
• Installed all underground and aboveground water copper piping for future tenant
• Installed underground and aboveground sewer and waste vents piping for future tenant
• Installed new concrete manhole for Duplex Pump Force Main Station that stretches 1200′ of discharge piping
• Completed upfit in restrooms and breakroom with piping and fixtures