RB Simms Water Treatment Facility

W.N. Kirkland partnered with Spartanburg Water to complete the renovation of the RB Simms Water Treatment Facility located in Chesnee, South Carolina. Our team worked closely with Harper General Contractors on the construction of this facility.   W.N. Kirkland project efforts include: • Installed all underground and aboveground water copper piping • Installed underground and … Continued

Proterra

W.N. Kirkland partnered with commercial electric vehicle (EV) manufacturer, Proterra, in the expansion of its 327,000 square foot battery systems manufacturing site located in Greer, South Carolina. The 500,000+ square foot design build facility is complete with a two-story office and break-room, compressed air piping system, and water sewer.   W.N. Kirkland project efforts include: … Continued

Pet Supplies Plus Distribution Center

Located in Orangeburg, South Carolina The 534,702 square foot distribution facility featured a unique and sophisticated pick module and conveyor system that is used to maintain an efficient nationwide distribution of pet food and supplies.   W.N. Kirkland project efforts include: • Installed all underground and aboveground water copper piping for future tenant • Installed … Continued

Exchange One, Two & Three

A series of 200,000+ square foot speculative facilities on 84 acres in the Exchange Logistics Park in Piedmont, South Carolina.   W.N. Kirkland project efforts include: • Installed all underground and aboveground water copper piping for future tenant • Installed underground and aboveground sewer and waste vents piping for future tenant • Completed upfit in … Continued

DC BLOX

Located in Greenville, South Carolina, the DC BLOX Data Center is a single-story, 26,583 square foot, 2 MW, Tier III data center on eight acres. The project also includes a 6,700 square foot interior build-out of data hall shell space and a utility yard.   W.N. Kirkland project efforts include: • Installed all underground and … Continued

Freightliner Custom Chassis Corporation Office Addition

Located in Gaffney, South Carolina, W.K. Kirkland partnered with Freightliner Custom Chassis to complete the addition of its 26,000 square foot two-story building. This modern office design includes 5,500 square feet of exterior curtain wall, lofted vehicle show area, operable glass walls, conference rooms, canteen, and training area. The 23,000 square foot existing offices are … Continued

BMW VIA Building

Located in Spartanburg, South Carolina, W.N. Kirkland assisted in the completion of a 60,000 square foot BMW Vehicle Accessories Center that included many group bathroom and many eyewash assemblies for this facility. The center will install a number of accessories and parts that support vehicles like the X3, X5 and X7 sport activity vehicles.   … Continued

BMW Manufacturing

Located in Greer, South Carolina, W.N. Kirkland assisted in completing multiple projects within BMW consisting of new line addition as well as Press Operation Facility.   W.N. Kirkland project efforts include: • Installed new 16″ Syphonic Roof Drain System in existing and new buildings, fully engineered • Installed all underground and aboveground water copper piping … Continued