Located in Greer, South Carolina, W.N. Kirkland assisted in completing multiple projects within BMW consisting of new line addition as well as Press Operation Facility.

 

W.N. Kirkland project efforts include:

• Installed new 16″ Syphonic Roof Drain System in existing and new buildings, fully engineered

• Installed all underground and aboveground water copper piping

• Installed underground and aboveground sewer and waste vents piping

• Completed upfit in restrooms and breakroom with piping and fixtures

• Installed natural gas piping system consisting of Schedule 40 steel piping

• Extensive roof drain piping system

• Installed emergency eyewash and showers for new terminal bay and carwash

• Installed new piping and plumbing fixtures in major kitchen renovation